Project Type | Description and Location | Organization | Contact |
|
|  |  |  |
|
|
Bogotá mass transit system
|
|
|
|
|
|
Instituto Nacional de Adecuación de Tierras (INAT)
|
|
|
|
Various oil and gas projects
|
|
|
|
|
Expanding Bogotá's drinking water supply system (Chingaza Project II)
|
|
|
|
|
Dredging of the Dique Canal
|
CARDIQUE and CORMAGDALENA
|
|
Environmental Policy Design
|
Design of national environmental policies on water, air, solid waste, and hazardous wastes pollution control
|
|
Fabio Arjona (Viceminister)
|
|
|
Hydroelectric Project Guamuez
|
|
Maria del Rosario Guerra (Director of Fonade)
|
|
|  |  |  |
Wastewater treatment plant
|
Tunjuelito sewage system (US$800 million)
|
|
|
Wastewater treatment plant
|
Fucha sewage system (US$700 million)
|
|
|
Wastewater treatment plant
|
Bogotá’s Juan Amarillo plant, Phase II
|
|
|
Wastewater treatment plant
|
Medellín (US$400 million); IDB funding.
|
Empresas Públicas de Medellín (EPM)
|
M. Valencia Cossio. (Director of EPM)
|
|
|
|
|
Julio Gómez Piqueras (General Manager)
|
Wastewaster treatment plant
|
|
|  |
Wastewater treatment plant
|
Bogotá Plain’s municipalities (Villapinzon, Facatativa, and Calera)
|
Corporación de Cundinamarca
|
|
|
|  |  |  |
Aqueduct/ Sewerage expansion
|
Montería (also includes operation, maintenance, administration)
|
|  |
Aqueduct/ Sewerage expansion
|
Barranquilla (also includes operation, maintenance, administration)
|
|
|
Aqueduct/ Sewerage expansion
|
Tunja (also includes operation, maintenance, administration)
|
|  |
Aqueduct/ Sewerage expansion
|
Buenaventura (also includes operation, maintenance, administration)
|
Buenaventura Mayor’s Office
|  |
|
|
Santa Marta (Rio Guachaca)
|
Santa Marta Mayor’s Office
|  |
Aqueduct/ Sewerage expansion
|
San Andres (also includes operation, maintenance, administration)
|
San Andres Governor’s Office
|  |
|
|  |  |  |
Energy Efficiency Program
|
|
Unidad de Planeamiento Minero Energético (UPME)
|
|
Air quality monitoring stations network
|
|
Departamento Administrativo de Medio Ambiente de Bogotá
|
|
Catalytic converters for vehicles
|  |
|
Carlos Herrera (Director Sectorial Environment)
|
Sulfur oxide emission controls for refineries
|
Barrancabermeja and Cartagena
|
|
Vice President, Oil Refining, Ecopetrol
|
Hydro-desulfurization of fuels
|
|
|
Vice President, Oil Refining, Ecopetrol
|
Modernization of the alkylation plant
|
|
|
Vice President, Oil Refining, Ecopetrol
|
Electrostatic filters for cement producers
|
|
Cementos Boyaca. Cementos del Caribe, Cementos Diamante, Cementos del Nare, Cementos Caldas, Cementos Paz del Rio, Cementos Hercules, and Cementos del Valle
|  |
Electrostatic filters for steel mills and metalworking shops
|
Siderurgica de Medellín (SIMESA), Siderurgica del Pacifico (SIDELPA) in Cali, Siderurgica del Norte (SIDENOR) in Barranquilla, and Siderurgica del Muna (SIDEMUNA) near Bogotá, and Acerias Paz del Rio near Sogamoso
|  |  |
Solid-Waste Management and Disposal
|  |  |  |
Master Plan for Solid Waste Disposal in Bogotá
|
|
|
|
|
|
Doña Juana Landfill (Bogotá); US$27 million.
|
|
|
Landfill construction and operation
|
Mondonedo Landfill (Cundinarmarca)
|
|
Diego Bravo (Director of CAR)
|
Landfill construction and operation
|
Various municipalities in the Bogotá Plains
|
|
Diego Bravo (Director of CAR)
|
Landfill construction and operation
|
|
|
|
Landfill construction and operation
|
Barranquilla; US$14 million
|
|
|
Hazardous-Waste Management and Treatment
|  |  |  |
Groundwater pollution control
|
Complejo Industrial de Barrancabermeja (refinery)
|
|
|
Groundwater pollution control
|
|
|
|
|
|
Cano Limon Coveñas pipeline
|
|
Fernando Gutierrez (Vice President, Transportation)
|
Environmental reference laboratory
|
|
IDEAM (Instituto de Estudios Ambientales y Metorologicos)
|
|
Environmental Management Systems and ISO 14000
|  |  |  |
Design and start environmental management system
|
|
Instituto Nacional de Vías (INVIAS)
|
Director of Environmental Affairs, INVIAS
|
Design and start environmental management system
|  |
|
|
Design and start environmental management system
|  |
Houston Oil Colombia (HOCOL)
|
Environmental Manager, HOCOL
|
|
|  |
Corporación Autónoma Regional del Río Nare (CORNARE)
|
Leonardo Muñoz (Director of CORNARE)
|
|
|  |
Colmotores (Colombia’s General Motors)
|  |
|
|  |
|  |
|
|  |
General Electric, Colombia
|  |
Title | Private Sector | Notes |
Cali-Candelaria Toll Road
| Yes | Approved |
Rio Bogotá Wastewater Treatment Project
| Yes | Approved |
Energy Efficiency Program
|  | Approved |
|
|  | Approved |
Porce II Hydroelectric Power Plant
|  | Approved |
Medellín River Sanitation Project
|  | Approved |
National Land Improvement Program (PRONAT)
|  | Approved |
|
|  | Approved |
Support of Privatization and Concessions in Infrastructure
|  | Approved |
|
| Yes | Approved |
|
|  | Approved |
|
| Yes | Approved |
Strengthening for the Water and Basic Sanitation Service Regulatory Commssion
|  | Approved |
Pacific Coast Sustainable Development Program
|  | Approved |
Wayuu Economic Development Project
|  | Approved |
Programa de Carreteras Departamentales
|  | EIA |
Programa de Desarrollo Territorial II
|  | EIA |
Fortalecimiento de la Gestión Educativa
|  | Proposed |
Formalización Propiedad y Titulación Predial
|  | EIA |
|
|  | Proposed |
|
| Yes | EIA |
Programa de Agua Potable y Saneamiento de Pereira
|  | Proposed |
Planta Termoeléctrica Termovalle
| Yes | EIA |
Programa de Tecnología y Sanidad Agropecuaria
|  | Proposed |
Integrated Rural Development
|  | Proposed |
Carretera Peaje Cali-Candelaria-Florida
| Yes | EIA |
Rationalization of Distribution Entities
|  | Proposed |
Tratamiento de Aguas Residuales para Santa Fe de Bogotá
|  | EIA |
Cartagena Sewerage System
|  | EIA |
Energía Gasoducto Termo Candelaria
| Yes | Proposed |
Apoyo a la Participación Económica de la Mujer
|  | Proposed |
Tibitoc Water Treatment Facility
| Yes | EIA |
Tibitoc Water Treatment Facility
| Yes | Proposed |
Technical Training for the Paper Industry
|  | Proposed |
|
|  | Proposed |